Project Proposals

Jack & Jill Bathroom Remodeling Proposal | Trends Kitchen & Bathroom Specialists
Trends Kitchen & Bathroom Specialists

Jack & Jill Bathroom Remodeling Proposal

Shared bathroom with dual entry. Scope, itemized pricing, and three-tier investment options featuring Kohler, Signature Hardware, and Brizo fixtures.

Project Scope

  • Demolish existing finishes in shared Jack & Jill layout; protect adjacent rooms
  • Install cement backerboard at floor and tub/shower surround
  • Apply waterproofing membrane at wet areas
  • Replace 5’ alcove bathtub (or retain) and tile the surround (porcelain), to ceiling
  • Install new porcelain floor tile throughout (≈80–110 sq ft)
  • Tile shower/tub walls (porcelain) with grout & caulking
  • Replace double-sink vanity top and undermount sinks (≈60")
  • Vanity Option 1: Refinish existing vanity (paint/spray + new hardware)
  • Vanity Option 2: Replace vanity (≈60" cabinet with drawers & doors)
  • Install two widespread faucets (Kohler / Signature Hardware / Brizo)
  • Replace mirrors and vanity lights (pair), update GFCI as needed
  • Replace tub/shower valve and trim kit
  • Replace toilet
  • Drywall repair as needed; make walls paint-ready
  • Install base shoe molding and make paint-ready
  • Paint walls and touch up trim as needed
  • Cleanup, haul-off, and final punch
Detailed Itemized Pricing
Item Description Range
Demolition & Haul-Off Remove tile/fixtures; prep walls/floor $1,400 – $2,100
Backerboard (Floor & Surround) Cement board installation $600 – $1,050
Waterproofing Membrane Wet area waterproofing $400 – $800
Bathtub (5’ Alcove) Acrylic/steel tub + install $1,400 – $3,000
Tub/Shower Valve & Trim Replace with tier fixture set $500 – $1,000
Tile Shower Walls ≈80–110 sq ft porcelain + grout $2,600 – $4,800
Tile Floor ≈80–110 sq ft porcelain + grout $1,500 – $2,400
Vanity Top + Sinks (≈60") Quartz or cultured marble, double undermount $800 – $1,600
Vanity Option — Refinish Paint/spray + new hardware $1,000 – $1,500
Vanity Option — Replace New ≈60" cabinet w/ drawers & doors $1,800 – $3,200
Widespread Faucets (x2) Brand/finish per tier $500 – $1,200
Mirrors & Vanity Lights (pair) Replace fixtures $500 – $1,000
Toilet Comfort-height replacement $400 – $800
Drywall Repair & Paint-Ready Patching, sanding, prep $400 – $900
Base Shoe (Install & Prep) Install and make paint-ready $200 – $400
Paint Walls + Trim Touch-Ups Two coats where needed $500 – $1,100
Cleanup & Final Punch Detail clean, haul-off $300 – $600

Three-Tier Investment (Choose Your Finish Level)

Essential Enhanced Premium

Package Fixtures Expected Investment
Essential Kohler / Signature Hardware / Brizo $18,500 – $23,000
Enhanced Kohler / Signature Hardware / Brizo $23,000 – $28,500
Premium Kohler / Signature Hardware / Brizo $28,500 – $35,000
Trends Kitchen & Bathroom Specialists • Kansas City Metro • trendskbs.com
Hall Bathroom Remodeling Proposal | Trends Kitchen & Bathroom Specialists
Trends Kitchen & Bathroom Specialists

Hall Bathroom Remodeling Proposal

Approx. 7’ × 9’ hall bathroom. Scope, itemized pricing, and three-tier investment options featuring Kohler, Signature Hardware, and Brizo fixtures.

Project Scope

  • Demolish existing tile floor and bathtub/shower surround in approx. 7’ × 9’ space
  • Install cement backerboard at floor and at tub/shower surround
  • Apply waterproofing membrane at tub/shower surround
  • Replace 5’ alcove bathtub; tile the surround (porcelain)
  • Install new porcelain floor tile with grout and caulking throughout
  • Tile shower walls (porcelain) with grout and caulking
  • Replace 36” vanity top and undermount sink; widespread faucet (Kohler / Signature Hardware / Brizo)
  • Vanity Option 1: Refinish existing vanity (paint/spray finish + new hardware)
  • Vanity Option 2: Replace existing vanity (new 36” cabinet with drawers & doors)
  • Replace mirror and vanity light; update GFCI as needed
  • Replace tub/shower valve and trim kit (brand options available in every tier)
  • Replace toilet
  • Drywall repair as needed; make walls paint-ready
  • Install base shoe molding and make paint-ready
  • Paint walls and touch up trim as needed
  • Cleanup, haul-off, and final punch
Detailed Itemized Pricing
Item Description Range
Demolition & Haul-Off Remove tile, prep walls/floor $1,200 – $1,800
Backerboard (Floor & Surround) Cement board installation $500 – $900
Waterproofing Membrane Tub/shower surround waterproofing $350 – $700
Bathtub (5’ Alcove) Acrylic/steel tub + install $1,300 – $2,700
Tub/Shower Valve & Trim Replace with tier fixture set $400 – $900
Tile Shower Walls 70–90 sq ft porcelain + grout $2,200 – $4,200
Tile Floor ≈63 sq ft porcelain + grout $1,200 – $2,000
Vanity Top + Sink (36”) Quartz or cultured marble $500 – $1,000
Vanity Option — Refinish Paint/spray finish + new hardware $800 – $1,200
Vanity Option — Replace New 36” cabinet w/ drawers & doors $1,200 – $2,000
Widespread Faucet Brand/finish per tier $250 – $650
Mirror & Vanity Light Replace fixtures $300 – $800
Toilet Comfort-height replacement $400 – $800
Drywall Repair & Paint-Ready Patching, sanding, prep $300 – $700
Base Shoe (Install & Prep) Install and make paint-ready $150 – $300
Paint Walls + Trim Touch-Ups Two coats where needed $400 – $900
Cleanup & Final Punch Detail clean, haul-off $250 – $500

Three-Tier Investment (Choose Your Finish Level)

Essential Enhanced Premium

Package Fixtures Expected Investment
Essential Kohler / Signature Hardware / Brizo $13,500 – $16,500
Enhanced Kohler / Signature Hardware / Brizo $16,500 – $20,500
Premium Kohler / Signature Hardware / Brizo $20,500 – $25,500
Trends Kitchen & Bathroom Specialists • Kansas City Metro • trendskbs.com
Master Bathroom Remodeling Proposal | Trends Kitchen & Bathroom Specialists
Trends Kitchen & Bathroom Specialists

Master Bathroom Remodeling Proposal

Large master bathroom upgrade including removal of jetted tub, installation of a free-standing bathtub, expanded walk-in shower with frameless glass, and a double-sink vanity. Scope, itemized pricing, and three-tier investment options featuring Kohler, Signature Hardware, and Brizo fixtures.

Project Scope

  • Demolish existing finishes; remove jetted tub and prep for free-standing bathtub
  • Reconfigure plumbing as needed for tub filler and expanded shower
  • Install cement backerboard at floor and shower walls; slope & waterproof shower pan
  • Build/extend walk-in shower with frameless glass enclosure
  • Install porcelain/stone-look tile at shower walls (to ceiling) and shower floor
  • Install new porcelain floor tile throughout master bath
  • Set free-standing bathtub and floor-mount or wall-mount tub filler
  • Double-sink vanity: new top with dual undermount sinks and widespread faucets
  • Vanity Options: Refinish existing cabinet (paint/spray + hardware)  |  Replace cabinet
  • Install mirrors and upgraded vanity lighting; update GFCIs as needed
  • Install new shower valve/trim (thermostatic/diverter if selected)
  • Replace toilet (comfort height)
  • Drywall repair as needed; make paint-ready; paint walls and touch up trim
  • Install base shoe and make paint-ready
  • Final clean, haul-off, and punch list completion
Detailed Itemized Pricing
Item Description Range
Demolition & Haul-Off Remove jetted tub, shower, flooring, prep $1,800 – $3,000
Backerboard & Substrate Cement board at floor & shower walls $700 – $1,300
Waterproofing System Shower pan, walls, niches (membrane) $700 – $1,300
Walk-In Shower (Tile) Walls to ceiling + shower floor (linear drain optional) $4,500 – $9,000
Frameless Glass Fixed panels/door, hardware $1,800 – $3,500
Free-Standing Bathtub Tub + set/trim $1,600 – $3,500
Tub Filler Floor-mount or wall-mount $700 – $1,600
Shower Valve & Trim Pressure-balance or thermostatic w/ diverter $900 – $2,200
Tile Flooring Master bath field tile + grout $1,800 – $3,200
Double Vanity Top + Sinks Quartz/cultured marble, dual undermount $1,200 – $2,400
Vanity Option — Refinish Paint/spray finish + new hardware $1,100 – $1,800
Vanity Option — Replace New cabinet (≈72" typical) w/ drawers & doors $2,500 – $4,800
Widespread Faucets (x2) Kohler / Signature Hardware / Brizo $600 – $1,400
Mirrors & Vanity Lighting Pair of mirrors + fixtures $600 – $1,400
Toilet Comfort-height replacement $400 – $900
Drywall & Paint-Ready Repairs, skim, sanding $500 – $1,100
Paint Walls + Trim Touch-Ups Two coats where needed $600 – $1,200
Base Shoe (Install & Prep) Install and make paint-ready $200 – $450
Cleanup & Final Punch Detail clean, haul-off $300 – $700

Three-Tier Investment (Choose Your Finish Level)

Essential Enhanced Premium

Package Fixtures Expected Investment
Essential Kohler / Signature Hardware / Brizo $28,000 – $38,000
Enhanced Kohler / Signature Hardware / Brizo $38,000 – $52,000
Premium Kohler / Signature Hardware / Brizo $52,000 – $75,000+
Trends Kitchen & Bathroom Specialists • Kansas City Metro • trendskbs.com